Home»Machinery & Equipment» Urgent Russian machinery orders? 3 stages + 4 major modules to accelerate the entire export process
"The Russian client demands delivery within 30 days, but the standard export process takes 45 days. What should we do?"—This is a recent issue in the machinery...Equipment ExportI. Compliance Acceleration: The Secret to Completing Technical Certification in 48 Hours
II. Logistics Efficiency Revolution: The Combined Solution of the China - Europe Railway Express + Pre - customs Clearance at the Port
1.Adopt the modular certification strategy: Decompose the complete machine into hydraulic/drive/control subsystems and apply simultaneously
Prepare GOST R 51672-2000 machinery safety standard documents in advance
Adopt a "modular certification" strategy: decompose the entire machine into hydraulic/transmission/control subsystems and apply for certification simultaneously.
2.Give priority to the Beijing and Harbin offices authorized by the Federal Agency for Technical Regulation and Metrology of Russia (Rosstandart), which can shorten the average certification cycle by 12 working days
II. Logistics Efficiency Revolution:
+ The Combined Solution of Pre - customs Clearance at the PortChina-Europe Railway ExpressOptimization Comparison Table of Transportation Modes
Innovative Mode of Pre - customs Clearance at the Port
2.Through the manifest consolidation declaration of Suifenhe Customs, the processing time of customs clearance documents for a single batch can be reduced by 60%
Through the "Manifest Consolidation" declaration at Suifenhe Customs, a single batch can reduce customs clearance document processing time by 60%.
IV. Standard Operating Procedure (SOP) for Emergency Orders
Guide to Connecting with the Russian MIR Payment System
Selection Criteria for Third - Party Guaranteed Transaction Platform (with Recommended Service Provider Ratings)
On the day of contract signing: Start the pre - classification application + electronic bottom account filing
Predicting Key Points of EAC Certification
Case of a Jiangsu injection molding machine enterprise: Through the above - mentioned plan, it only took 22 days from order placement to delivery in Novosibirsk, which is 58% shorter than the industry average transit time.
Day3: Completion of Russian translation of technical documents and notarization with dual authentication
Day5: Arrange factory pre-inspection and simultaneous shipment
Day 12: Completion of the "Two-Step Declaration" on the Electronic Port.
Day15: Post-arrival inspection of goods
: In 2023, the Russian customs added Decree No. 481 - FZ. It is recommended to check whether the HS code of the product is involved in the special supervision catalog before export. Real - time policy interpretation can be obtained through the Russia - Ukraine Zone of the China Council for the Promotion of International Trade.
Special Reminder: In 2023, Russian Customs introduced the new Decree No. 481-FZ, recommending exporters to verify whether the HS codes of their products fall under special regulatory lists before shipment. Real-time policy interpretations can be obtained through the "Russia-Ukraine Special Zone" on the China Council for the Promotion of International Trade (CCPIT) website.
Conclusion: The essence of emergency order processing lies in the precise anticipation of the supply chain. It is recommended to establish a dedicated Russian export emergency task force and solidify the "5-day response mechanism." Immediately contact professional Russian trade service providers to obtain customized acceleration solutions. Click here to download the "Mechanical Equipment" guide.Compulsory certificationHow is the agency service fee calculated for exporting machinery and equipment to Russia? A must - read guide for enterprises